Project: Comcast Sportsnet, Mid-Atlantic
Customer Address: 7700 Wisconsin Avenue, Suite 200 Bethesda, Maryland 20814
Customer Contact: Steven Webber, Director of Engineering
Description of Project: Provided integration services for an all new cable origination facility. Beck Associates designed, documented and installed all broadcast systems for the facility which included five master controls, a production control room, and seven edit suites.
Date of Contract Award: October, 2005
Date of Completion: September, 2006
Total Contract Value: 5,303,715.00
Similarity: A portion of the scope of work included the creation of an HD production control environment.
Project Team: Paul Kast - Senior Project Engineer
Project: Comcast Sportsnet, Philadelphia
Customer Address: 3601 South Broad Street Philadelphia, PA 19148
Customer Contact: David Finocchiaro, Director of Engineering
Description of Project: Comcast SportsNet moved its technical operations into a new building and hired Beck Associates for the design, installation and systems integration of the central equipment room, two master control suites, an ingest area, a production/audio control room, two studios, eight news edit suites, a news feed room, several I/O locations in the news room, three promo edit suites, graphics lab, a viewing suite, and an audio suite.
Date of Contract Award: April, 2007
Date of Completion: February, 2008
Total Contract Value: 4,732,500.00
Similarity: A portion of the scope of work included the creation of an HD production control environment.
Project Team:
- Paul Kast - Senior Project Engineer
- Eric Hirschberger - Project Engineer
Project: Comcast Sportsnet California
Customer Address: 370 Third Street Suite 200 San Francisco, 94107
Customer Contact: Peter Schofield, Chief Engineer
Description of Project: Provided complete integration services for the design and build of a new sports news origination facility with central equipment room, tape room, 2 studios each with dedicated production and audio control rooms.
Date of Contract Award: October, 2008
Date of Completion: August, 2009
Total Contract Value: 4,496,421.00
Similarity: A portion of this project included a production control room. It operates as a component of the complete broadcast technical plant.
Project Team:
- John FitzRandolph - Senior Project Engineer
- Dewey Cash - Project Engineer
- David Basil - Technical Supervisor