Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

GATEWAY SOUTHLAKE, TEXAS

GATEWAY CHURCH Contact: Doug Sluiter Executive Director
Gateway Church has over 16000 members and serves the Dallas/ Ft. Worth Metroplex with three campuses. Their new primary campus was inaugurated in 2010 and includes extensive audio and HD video production capability and facilities. Beck Associates was hired to provide system integration services for the project. The new facilities include 7 Sony studio cameras, 4 robotics cameras, an Evertz routing system, Sony production switcher, Image video tally systems, Evertz VIP monitor multiplexing, eight channels of EVS, Yamaha audio console, Reidel Intercom system and Final Cut non-linear editing suites. The campuses are interconnected for bidirectional video, audio, and communications by a Reidel fiber multiplexing system, also installed by Beck Associates.

 

 


white line